Inventory inputs
Enter existing videos and written testimonials separately from new responses expected during the comparison period. For cumulative plans, the forecast assumes you keep existing records and do not delete the new ones. Eight existing videos plus twelve new videos therefore produces a twenty-video requirement.
Recurring allowances need a period. An average derived from a yearly forecast cannot prove that a peak campaign fits a monthly allowance. Where a plan’s reset rule is not verified, the result preserves that gap rather than inventing one.
Historical collection is a separate count
A retained-inventory plan counts what you keep. An all-time plan can also count deleted or unapproved records. Senja Free uses an all-time rule. Enter the selected vendor’s already-counted total, including any current records already in that total. This information applies to that vendor, not to every candidate in a comparison.
If Senja has already counted fourteen records and you keep four of those, two future new responses bring usage to sixteen, not twenty. Add a kept record only if it has not yet been counted there, such as an unimported item. Leave either count blank when unknown; the calculator can still identify a known minimum that exceeds a cap, but cannot confirm capacity from missing history.
The reviewed Testimonial.to rule specifically says deleted video testimonials still consume video credits. Enter its used-video counter and uncounted existing videos separately. Two video credits already used plus one planned new video require three, even if both earlier clips were deleted. We have not established an equivalent text deletion/reset rule, so the calculator keeps that format conditional rather than extending the video rule to it.
Projects and other boundaries
Brands, projects or spaces, website domains and operator seats are separate inputs. A vendor’s plan unit determines which base price can be multiplied; it does not establish that a project maps exactly to a brand or domain. Domain rules remain a verification question when no source establishes them.
For multiple projects with per-project caps, provide the largest project’s retained video, text or combined inventory if known. The total library cannot prove its distribution. A missing largest-project requirement prevents a definitive capacity result rather than causing a false rejection against one project’s cap.
Money and billing
Prices use USD, with cents preserved in the calculation. Monthly cash, twelve monthly payments, annual upfront cash and the annual monthly equivalent appear separately. The yearly equivalent is rounded for display; it is not a claim that the supplier offers that monthly payment option.
The displayed base estimate excludes unverified taxes, exchange fees and mandatory additions. Final tax is unknown until the supplier calculates it. Do not interpret a blank tax field as zero or authorize a payment from the estimate alone.
Fit labels and saving
A known limit that fails your requirement produces a does-not-fit result. Missing required facts produce a verify-before-buying result. A price alone cannot overcome unknown original-file export, consent metadata or withdrawal behavior.
You can save a comparison to your account and export its plan facts and sources. Saved requirements preserve the assumptions; current public facts are used when you reopen research. The low-volume guide explains when a free or manual workflow may be enough.
Turn a result into a vendor question
For eight retained videos plus twelve planned additions, enter the current eight and the future twelve separately. If using a vendor-specific all-time counter, it already includes the current records counted there; add only uncounted imports and future responses. Monthly shared allowances combine new text and video. Missing history or per-project peaks keep the result conditional.
